What Do the New Biodiversity Net Gain Requirements Mean for NSIP Projects?


Published: 26 November 2026
offshore wind farm

From the 2nd of November 2026, Biodiversity Net Gain (BNG) became mandatory for qualifying Nationally Significant Infrastructure Projects (NSIPs) in England, marking an important change in how major infrastructure developments must consider and deliver biodiversity improvements.

Developers submitting new Development Consent Order (DCO) applications under the relevant requirements must now demonstrate how their projects will achieve at least 10% Biodiversity Net Gain.

For major infrastructure schemes, including energy, transport and water infrastructure, this means biodiversity considerations need to be integrated into project design and planning from the outset.

But what do the new requirements involve, and what should developers be doing to prepare?

green field

What Has Changed for Biodiversity Net Gain and NSIPs?

Biodiversity Net Gain is an approach to development that aims to leave biodiversity in a measurably better state than before development takes place.

Mandatory BNG has already been introduced for many developments proceeding through the Town and Country Planning Act system. Following the changes to Biodiversity Net Gain for smaller development sites in August 2026, the requirements have now been extended to qualifying NSIPs in England from 2 November 2026.

Under the new framework, developers must demonstrate how they will achieve at least a 10% increase in biodiversity value, calculated using the statutory biodiversity metric.

The requirements apply to relevant DCO applications submitted on or after 2 November 2026. Applications submitted before this date are not retrospectively brought within the new mandatory NSIP BNG framework.

The framework has also been designed to reflect the scale and complexity of infrastructure projects, with specific provisions for defining the BNG boundary, temporary habitat impacts and phased development.

Developers should refer to the government's official guidance on Biodiversity Net Gain for NSIPs and the biodiversity gain statement relevant to their project.

What Must Developers Include in Their DCO Application?

A key requirement is the preparation of an outline biodiversity gain plan, which must accompany relevant DCO applications.

This plan sets out how the proposed development is expected to achieve the statutory biodiversity gain objective.

It should be supported by appropriate ecological information, including:

  • Baseline habitat surveys and habitat condition assessments.
  • Biodiversity calculations using the statutory biodiversity metric.
  • Details of habitats expected to be lost, retained, created or enhanced.
  • An explanation of how the mitigation hierarchy has been considered.
  • A proposed strategy for delivering biodiversity gains on-site, off-site or through a combination of approaches.
  • Information about how the proposed gains will be secured, managed and monitored.

The level of detail will depend on the project and the relevant biodiversity gain statement.

An outline biodiversity gain plan is not simply a commitment to deliver 10% BNG at a later date. Developers must provide a credible strategy demonstrating how the objective can be achieved.

Updated biodiversity gain plans, or phase-specific plans where appropriate, are subsequently required before the relevant development or phase commences.

How Does Biodiversity Net Gain Affect NSIP Design Decisions?

The introduction of mandatory BNG for NSIPs makes biodiversity a factor in scheme design, land requirements and programme, not just a consenting consideration. Large linear and multi-site projects can affect extensive areas of habitat, often across several local authority areas and over long construction timeframes, so the scale of any biodiversity requirement can be significant.

A robust ecological baseline gives design teams the information they need to make informed choices while there is still flexibility to act on them. It can help to establish:

  • Which habitats are present, and in what condition.
  • Whether any habitats of particular ecological importance could be affected.
  • Where retention, restoration or enhancement is realistically achievable.
  • The likely biodiversity unit requirement arising from the scheme.
  • Whether additional land or off-site units may be needed, and the cost and lead time involved.

These findings can directly influence route options, construction compounds, landscaping proposals and land acquisition. In many cases, retaining an existing area of valuable habitat will be more practical, and more cost-effective, than removing it and recreating equivalent value elsewhere. This is the mitigation hierarchy in practice: avoid impacts where possible, minimise those that cannot be avoided, and address residual effects appropriately.

Treating BNG as an integral part of the design process helps avoid late-stage surprises and supports a more deliverable application.

Can NSIP Developers Deliver Biodiversity Net Gain Off-Site?

Yes. The NSIP framework allows developers to consider on-site and off-site biodiversity gains alongside one another.

For some infrastructure projects, achieving the full biodiversity gain requirement within the development boundary may be challenging because of operational, safety, land availability or design constraints.

Where appropriate, developers can secure biodiversity units from registered off-site habitat creation or enhancement projects.

However, the availability of suitable units should not be assumed.

Large infrastructure schemes may require substantial numbers of biodiversity units or particular habitat types that are not readily available in the existing market.

For this reason, Defra advises developers to engage with potential off-site providers as early as possible. Early engagement can help identify whether suitable habitat delivery opportunities exist and whether new habitat creation projects may need to be established.

Developers do not necessarily need to purchase biodiversity units before receiving consent. However, their outline biodiversity gain plan must provide sufficient assurance that the proposed approach is achievable.

Where the proposed off-site strategy lacks sufficient evidence, this may lead to additional scrutiny during the consenting process.

Statutory biodiversity credits are also available as a last resort where the required gains cannot be delivered through on-site or off-site measures.

What Are the Implications for Large or Linear Infrastructure Projects?

The new requirements include provisions that are particularly relevant to projects covering large geographical areas, such as roads, railways, pipelines and electricity transmission infrastructure.

Defining the BNG Boundary

For NSIPs, the BNG boundary is used to identify the habitats relevant to the biodiversity calculation.

The framework focuses on habitats affected by the proposed development rather than automatically requiring every habitat within the wider project area to be included.

Correctly defining this boundary is therefore an important early consideration.

Spatial Risk and Off-Site Habitat Delivery

The statutory biodiversity metric encourages habitat gains to be delivered close to the development through spatial risk multipliers.

For area habitats and hedgerows, these calculations consider local planning authority and National Character Area boundaries.

Where an NSIP's BNG boundary spans multiple relevant areas, off-site gains delivered within any of those areas may avoid a spatial risk penalty.

Different catchment-based rules apply to watercourse habitats.

These provisions may provide greater flexibility for linear infrastructure projects, but the correct application of the metric requires careful assessment.

Temporary Habitat Impacts

Major infrastructure projects frequently involve temporary construction compounds, access routes and other working areas.

The NSIP framework includes specific provisions for temporary habitat impacts and reinstatement.

Where habitats can be reinstated to their original type and condition, the biodiversity calculations may differ from those for permanent habitat loss.

Understanding these distinctions can help developers prepare proportionate and accurate biodiversity assessments.

How Will Biodiversity Gains Be Managed and Monitored?

Delivering 10% BNG involves more than identifying areas for habitat creation.

Significant on-site biodiversity gains and registered off-site gains generally need to be secured, managed and monitored for at least 30 years.

Developers must therefore consider whether their proposed habitats can realistically be established and maintained over the required period.

This includes understanding the ecological suitability of the land, the habitat management needed and the arrangements for long-term monitoring.

For projects relying on off-site biodiversity units, it is also important to undertake appropriate due diligence and establish how the required gains will be secured.

Early consideration of these matters can help ensure that biodiversity commitments are deliverable in practice.

How Can Ecology by Design Support NSIP Developers?

The introduction of mandatory BNG for NSIPs places greater importance on obtaining reliable ecological information early in the planning process.

At Ecology by Design, our experienced ecologists can support developers and project teams in understanding the ecological considerations associated with major infrastructure projects.

This can include habitat surveys, ecological assessments, biodiversity baseline information and advice on opportunities to avoid, minimise and address ecological impacts.

By identifying ecological constraints and opportunities early, developers can make more informed decisions about project design and biodiversity delivery.

As the new requirements become embedded within the NSIP consenting process, a clear understanding of existing habitats and potential biodiversity impacts will be essential to developing an appropriate BNG strategy.

Planning a major infrastructure project?

If you are preparing a development proposal and need ecological advice, contact Ecology by Design to discuss your project's requirements.

Our team can help you understand the ecological surveys and assessments needed to support informed planning and development decisions.

Frequently Asked Questions About BNG

Is biodiversity net gain mandatory in the UK?

Biodiversity Net Gain (BNG) is mandatory for most qualifying developments in England, requiring developers to achieve at least a 10% increase in biodiversity value.

The requirements were introduced for major developments in February 2024 and most small developments in April 2024. From 2 November 2026, mandatory BNG also applies to qualifying Nationally Significant Infrastructure Projects (NSIPs).

The same statutory 10% requirement does not automatically apply across Scotland, Wales and Northern Ireland, where different planning and biodiversity policies operate.

What new environmental legislation is expected in the UK in 2026?

One of the most significant changes to biodiversity requirements in England during 2026 was the extension of mandatory Biodiversity Net Gain to qualifying Nationally Significant Infrastructure Projects from 2 November.

This followed changes introduced on 6 August 2026, including new BNG exemptions for qualifying developments of 0.2 hectares or less and certain temporary developments.

These changes affect how developers assess biodiversity impacts, prepare planning applications and plan habitat creation or enhancement.

For further information, read our guide to Biodiversity Net Gain changes for smaller development sites.

What planning applications are exempt from BNG?

Not all planning applications in England are subject to mandatory Biodiversity Net Gain.

Exemptions include householder applications, such as extensions and loft conversions, certain permitted developments, and qualifying developments of 0.2 hectares or less that do not affect on-site priority habitats.

Other exemptions include developments with minimal habitat impacts under the de minimis rules and qualifying temporary developments permitted for five years or less.

The applicable exemptions depend on the development type, application date and potential habitat impacts. Developers should check eligibility before assuming their project is exempt.

How much can you earn from BNG?

Landowners may be able to generate income from Biodiversity Net Gain by creating or enhancing habitats and selling biodiversity units to developers who need to meet their BNG requirements.

However, there is no fixed price for a biodiversity unit. Potential earnings depend on factors including habitat type, biodiversity value, location, market demand and the costs of habitat creation and management.

Landowners must also consider the legal and financial commitments involved, as registered off-site BNG habitats generally need to be managed and monitored for at least 30 years.

An ecological assessment can help establish the potential biodiversity value of a site and inform whether habitat creation or enhancement could provide a viable opportunity.